Preventive maintenance is the set of inspections and services performed on a machine before it fails, based on its run time, operating cycles or actual condition. Its goal is not to repair: it is to keep the repair from becoming necessary at the worst possible moment, when the line is already down.
Preventive vs. corrective maintenance: the difference that costs money
Corrective maintenance acts after the failure: the machine stops and that is where the work begins. Preventive maintenance acts beforehand, on a schedule, so the failure never happens in production. The difference is not only operational, it is economic: an emergency repair means spare parts sourced against the clock (and at a premium), overtime labor and, above all, lost production hours while the equipment sits idle.
It is a generally accepted rule in the industry that an unplanned failure can cost several times more than the same intervention performed on schedule, once you add up emergency spare parts, overtime and halted production. That is why well-run maintenance programs are not measured by how much they spend on service, but by how many unplanned stoppages they prevent.
What a preventive maintenance program includes
A real preventive program combines several elements, not just a list of dates on a calendar:
- An inventory of critical equipment, with the manufacturer's service recommendations
- Inspection and service frequencies based on run hours, cycles or equipment condition
- Lubrication, adjustment and replacement of wear components before they fail
- Spare parts and consumables available in advance, not bought under pressure
- A record of every intervention, to spot patterns and anticipate recurring failures
The ISO 55000 asset management framework states this same principle at a strategic level: balancing cost, risk and performance across the asset's service life, rather than managing each machine as an isolated expense.
What the standard requires in Mexico
In Mexico, maintaining machinery and equipment is not merely good practice: NOM-004-STPS-1999 requires workplaces to identify the risks their machinery creates, draw up a specific health and safety program for its operation and maintenance, train the personnel involved, and keep protective systems and safety devices in good working order. A well-documented preventive maintenance program does not only protect the equipment: it is also the evidence the standard expects you to have on hand.
How to structure a program that actually works
Preventive maintenance programs that hold up over time share a simple foundation:
- Prioritize first the equipment whose failure stops the entire line, rather than treating every machine alike.
- Assign a clear owner for each machine and each intervention.
- Secure the supply of spare parts and consumables before they are needed, not after.
- Review the failure history to adjust frequencies with real data, not just the manual.
What all of these steps have in common is material availability: a perfectly planned maintenance program is worth nothing if the spare part, the lubricant or the wear component is not on site the day the service is due.
Frequently asked questions
What is the difference between preventive and corrective maintenance?
Corrective maintenance repairs the equipment after it fails; preventive maintenance intervenes beforehand, based on run time, cycles or condition, so the failure never happens.
What does NOM-004-STPS require regarding machinery maintenance?
Identifying the risks posed by the machinery, having a specific health and safety program for its operation and maintenance, training personnel, and keeping protective systems in good working order.
What do you need to start a preventive maintenance program?
An inventory of critical equipment, the manufacturer's recommendations, defined service frequencies, an assigned owner, and a supplier who guarantees the availability of spare parts and consumables.
IMS Global, your partner in preventive maintenance
At IMS Global we supply the spare parts, lubricants and consumables your preventive maintenance program needs, when it needs them. With on-site inventory management (VMI) and our SAMI system, we make sure the material is available before the service falls due, so your maintenance program never depends on a last-minute purchase. If you are looking for a supplier who sustains your maintenance plan, not just one who sells you parts, we can help.